These works focused on a section of 675 metres long of this popular path through the Manilva Ecological Reserve and consisted of resurfacing using totally ecological materials, a rope railing along this stretch has also been installed to preserve this protected beach area.
Funding for this project was provided by the Diputación de Málaga provincial government and from the local Environment and Infrastructure and Works departments.
Announcement